• ICON BUSINESS CENTER - Beirut's leading destination for modern workspaces.Our Modern Business Hub includes a ground floor with a grand entrance hall, conference room, and two versatile commercial spaces to be used as showrooms or restaurants complete with indoor and outdoor terraces. Across ten of the thirteen floors, you'll find a range of contemporary office spaces designed to meet diverse business needs.Take your business to new heights at ICON Business Center ICON Business Center represents the pinnacle of modernity, featuring state- of-the-art amenities and a sleek, contemporary workspace environment.

    Perspectives

    Floor plans

  • 997 Sin el Fil

    Rising in a prime and well-connected location, Sin El Fil 997 is a contemporary residential tower defined by generous proportions, clean architectural lines, and expansive glass façades. Spacious residences open onto broad balconies and terraces, while landscaped gardens, a pool, residents’ lounge, and gym create a refined living environment shaped around comfort, privacy, and modern city life. Developed, constructed, and represented by CC Contractors.

    Perspectives

    Floor plans

  • Beit Mery 4858 - 4859

    Set in the heart of Beit Mery, this contemporary residential development brings together two distinctive buildings designed around generous living spaces, expansive terraces, landscaped outdoor areas, and refined architectural detailing. Developed, constructed, and represented by CC Contractors, Beit Mery 4858–4859 offers a modern residential experience that combines comfort, privacy, and a strong connection to its surrounding landscape.

  • CENTRAL business center serves the purpose of several businesses, industries and a wide range of professionals and commercial enterprises with some of the most state-of-the-art facilities and amenities required in modern-day commerce. The venue is facilitated with a number of quality services with its touch of elegance and sophistication displayed in the architectural structure of the location. CENTRAL is a commercial center right next to Beirut, near Habtoor Hotel. With the benefit of proximity and brevity of travel needed by all business owners and customers alike, the destination is a central hub for a host of needs and wants. Being adjacent to the massive Habtoor hotel, it is also a big drawing point for innumerable potential clients and customers.

    Floor plans

  • Strategically located in the nexus of Lebanon’s Metn region between the Damascus Highway and the Beirut Central District, Qubic Square is a destination for the corporate world of Beirut and beyond. It will be home to small companies, and major commercial businesses, all of whom understand the value of our “business meets lifestyle” approach to optimize their productivity. With its spacious lounge, welcoming reception center, and more than 120 additional guest parking spaces, Qubic Square will be a hub for your business.

    Floor plans

  • Qubic Center

    Situated on the axis between Lebanon’s Metn region, the international Damascus Highway and the Beirut Central District location, the center is an authentic fusion of the full-service business world in one venue. It serves the purpose of several businesses, industries and a wide range of professionals and commercial enterprises with some of the most state-of-the-art facilities and amenities required in modern-day commerce. The venue is facilitated with a number of quality services with its touch of elegance and sophistication displayed in the architectural structure of the location. The Center includes ample public and visitor parking facilities, in addition to individual private tenant spaces.

    Floor plans

  • Symposium Center

    The Beirut Symposium Executive Center is a veritable hybrid in the world of full-service business venues. It caters to the widest possible scope of needs of professionals and commercial enterprises with some of the most state-of-the-art facilities and amenities required in modern-day commerce.The Beirut Symposium includes a variety of offices, as well as a tastefully arranged cigar lounge and restaurant. The center also accommodates the more creative sensibilities of visitors at the WEST HALL of the Symposium, where the spirit of culture, art and imaginative thinking is promoted and encouraged. The West Hall offers wide array quality services around professional networking, business lobbying, targeted assemblies, and more facilities that suit your business needs. The West Hall is exclusively designed for business meetings, conferences, product launches, staff training, book signature etc... Also to accommodate a group of 15 to 160 persons, the West Hall features 3 conference facilities of varying sizes; small, medium and large.

    Perspectives

    Floor plans

  • CONDO 167

    Residential project in Larnaca, Cyprus

    Floor plans

  • Situated in one of Larnaca’s most desirable neighborhoods, residents of VISTA Faneromenis enjoy easy access to pristine beaches, upscale shopping destinations, fine dining establishments, and vibrant entertainment options. This exclusive building offers a truly luxurious living experience, combining opulence, comfort, and breathtaking views. The design of Vista Faneromenis is exquisite, with every aspect meticulously crafted to exude sophistication and elegance. From the grand entrance to the meticulously landscaped gardens, the attention to detail is evident, creating an atmosphere of luxury and refinement. The architectural design seamlessly blends modern aesthetics with timeless elements, making it an iconic landmark in the city. The residences within Vista Faneromenis are a testament to luxury. Impeccable attention to detail is evident throughout, from the finest quality finishes to the use of premium materials. Characterized by whimsical designer décor and unparalleled amenities, our richly crafted two-bedroom apartments are designed to give you the ultimate luxury experience. Each residence offers a world of unparalleled luxury and comfort, providing an ambiance of refined opulence. Whether you desire a serene retreat or a vibrant cosmopolitan lifestyle, Vista Faneromenis is the perfect place to call home, offering impeccable design, unparalleled amenities, and a prime location.

    Perspectives

    Floor plans

  • Beirut's premier workspace destination. Our modern facility boasts a ground floor with a main hall, conference room, a spacious showroom with both indoor and outdoor terraces. Numerous offices across eleven of the twelve floors, provide a variety of contemporary workspace options. Elevate your business at Q Business Center. Q Business Center embodies modernity at its finest, offering cutting-edge facilities and a contemporary workspace environment. Situated in the vibrant heart of Beirut, our location serves as a bustling hub for businesses, providing easy access to key amenities and a thriving commercial community. At Q Business Center, modernity is not just a concept—it's a standard we uphold in every aspect of our business center. Our high-standard facilities are designed to meet the needs of today's businesses, offering high-speed internet and 24/7 security to ensure your peace of mind. Our valet service and dedicated receptionists are here to provide you with the highest level of service and convenience. With Q Business Center, you can trust that every detail has been considered to provide you with a workspace that meets the highest standards of modernity and functionality.

    Perspectives

    Floor plans